Aidan Kelly · 6.4kWp · 10.4kWh in Strabane — £11,240 at 38.7% margin, now at "Install". Every stage, cert, part and photo tracked in one record — nothing on a clipboard.

J-1042 · Solar + Battery · Liam B, Sean G

Aidan Kelly

6.4kWp · 10.4kWh · Strabane BT82 8DP · due Today

InstallG99 · Approved
Contract value
£11,240
0% VAT · SEG eligible
Gross margin
38.7%
Est. generation
5,720
kWh / yr est.
DNO connection
G99
DNO-G99-4471 · Approved

Solar system designer

what gets fitted on the roof6.4kWp
Array layout6.4kWp · 16×400W · 1 stringSouth-west · 35° · Slate
Shading: None·Panel 400W · 16 totalSEG export eligible
InverterHybrid 5.0kW
Battery10.4kWh BESS
Optimisers16× DC power optimiser
RoofSouth-west · 35° pitch · Slate
SEG / exportEligible — MID + SEG on handover
Generation forecast · 12-mo
5,720 kWh / yr est.
813 kWh
peak · Jun
JFMAMJJASOND

Job lifecycle

survey → handover · every stage stamped4/7 done
Survey✓28 Jul
Roof survey + design sheet
Design & quote✓30 Jul
Quote accepted, 30% deposit
DNO / G99✓2 Aug
G99 approved — the DNO
Procurement✓12 Aug
PO-2231 received & checked in
InstallCurrentToday
Crew on site — day 1 of 2
Commission—
BS EN 62446 tests + EIC
MCS handover—
MCS cert + handover pack + MID

Job costing

where the money goes · live from Xero38.7% GM
Equipment (panels, inverter, battery)£4,820
Consumables + mounting£640
Labour (2 installers × 2 days)£980
Scaffolding (sub-contract)£450
Direct cost£6,890
Contract £11,240£4,350 gross
cost £6,890margin 38.7%

Compliance chain

6
DNO — G99 approvalSigned
the DNO · 2 Aug
EIC (BS 7671)Due
Due on commissioning
Commissioning (BS EN 62446)Due
Due tomorrow
MCS certificatePending
After commissioning
MID registrationPending
≤10 working days
RECC + handover packPending
On handover

Stock allocated

5/6 loaded
16×
440W mono panel
Van — Sean G
Loaded
1×
Hybrid inverter 5.0kW
Warehouse
Loaded
2×
Battery module 5.2kWh
Warehouse
Loaded
12×
Mounting rail (2.1m)
Van — Liam B
Loaded
16×
DC optimiser
Van — Sean G
Loaded
40×
DC cable 6mm²
Van — Liam B
To load

Site photos

4
IMG_1200
Roof — before
SW slate roof, 35° pitch, clear of shading
IMG_1201
Array layout
16 panels, 2 columns, 1 string
IMG_1202
Inverter + battery
Utility cupboard, 2× 5.2kWh stacked
IMG_1203
Consumer unit
Henley block + generation meter fitted
Customer
AK
Aidan Kelly
C-118 · Strabane BT82 8DP
→

Customer wants app monitoring set up on handover. Battery bay pre-cleared.